Monday 29 October 2012

Submit draft proposal.

Today i already submit my draft proposal to my supervisor. This submission is to make sure that the proposal that i had made will fulfill the requirement. The due date for this proposal on week 14 which is on the next week. I am really sure that this proposal will finish on time as in schedule.

Friday 26 October 2012

Go to Jalan Pasar

Im go to Jalan Pasar, go to the Nixie Shop to buy the component. I also ask the Nixie Technician about my project. The technician give an opinion  to add something in my project. The diode is actually is very important in the circuit because function of diode is to protect the source to get the reverse current. for the circuit function well we must put the diode between the wire. That the knowledge that i get in Nixie, Jalan Pasar, Kuala Lumpur.

Monday 22 October 2012

Progress On My Proposal

Today i make my proposal report, today i already finish on objective, problem statement and work plan.This proposal must be submitted on week 14 which is at the end of the week before 4pm. The date is on 9/11/2012. Currently almost 20% of the proposal report have i finish, another 80% i will finish in this week. This week a little bit busy, i need to focus on other subject but i will make sure that my report proposal will finish on time.

Thursday 18 October 2012

Work Plan For Next Sem

Work Plan For Next Sem
Assalamualaikum.. Today i want to share about my my work plan which the planning that i made to complete this project on time. I already attach the Picture of my work plan that i must follow in order to finish my project on time. As in the figure above i expect my project will be completed at early of march, and i have another 1 month to finish my final report. That a little bit explain about my next step on this project.

Sunday 14 October 2012

Block Diagram

Block Diagram

Today i would share about my Block Diagram of my final year project. Block diagram is actually is the overall view of the project. Based on the Block diagram we would know the flow of the project. My project has a temperature sensor, cooling element, heating element, PLC module, Cx - One, and computer. Below are the listing what type that i would use in the project.

  1. Temperature sensot = LM35DZ
  2. Cooling element = water
  3. Heating element = heater
  4. Plc module = CP1H
  5. Sofware Scada is Cx-one.

Wednesday 10 October 2012

Hot spring in Malaysia

I'm searching the hot spring in Malaysia because one of the target customer is at the hot spring because them can easily get the hot water. here i attach the link that i search which is the website of the hot spring location in entire Malaysia.

Link : http://www.travelguide.com.my/hot-springs.htm#Negeri%20Sembilan

Monday 8 October 2012

Meet My Supervisor

Today i meet my supervisor to show her slide of my presentation. We discuss what should i add in that slide and remove the things that not important to say. I would be present of my proposal final year project on this Thursday, 11 Oct 2012. I should be prepare to answer all of things that assessor ask. Based on the research that i already made i should be fine in that presentation. I attach the Picture of my slide as a prove that i doing the presentation. 


Saturday 6 October 2012

Get an Information

Today i will go out meet one of my friends which is my senior to ask him about the PLC. I already forgot what i have learn in PLC. actually i already learn PLC in my Diploma but when i don't practice or play around with that thing i almost forgot about it. So today i will remain back what have i learn in the PLC syllabus in my Diploma. My senior are stay at Taman Ukay Perdana at Ampang Selangor. hopefully i can understand and remind back what have i learn in PLC because one of the task that Sir Saiful give is to create one of the program PLC in the real life. I decided to make system an car park which is same as Figure below.


Wednesday 3 October 2012

Learn SCADA system

Today meet Mr saiful, one of the lecturer that know about SCADA. Learn basic thing about SCADA such as want to operate a motor, how to control a switch, also learn about coding in the Visual Basic. He is the one that master in Scada which through Visual basic. I present about my research on the new software that he want me to discover which is Cx-One. Cx-one is one of the Scada software produce by OMRON company. I had research the program and know a little bit function on Cx-one. Next task, En Saiful want me to design one of the program in the real life that can be monitor and control. He ask me to come and see him again next week.

Monday 1 October 2012

PLC in Real life

From research that i have done. The PLC is one of the important thing that should know when we want to go in the industry. this is because many industry will use the PLC compare with the PIC. function of pic and plc is almost the same which is it will read data from sensor make as an input and produce the output. here i attach a overall proses picture.